Главная / Новости / News / "Turboatom" the beginning of the design of equipment for HPP Gotsatlinskoy
12:31, 14 Марта 11
"Turboatom" the beginning of the design of equipment for HPP Gotsatlinskoy
Specialists of OJSC "Turboatom" transgressed the design of equipment for HPP Gotsatlinskoy, built on the river Avarsk Coys in Dagestan.
Engineer, started the design work of two Francis turbines of unit capacity of 51 MW with the impeller diameter 3,1 m and two disk hydro valves with diameter of 4 m for Gotsatlinskoy HPP. Preparing to test the model turbines, after which the plant will begin manufacturing the equipment.
Contract to supply equipment for the plant was signed in February this year.
Все новости за сегодня (0)
|
«Гидропрессу» — 80 лет
В честь 80-летия в ОКБ «Гидропресс» прошла церемония награждения сотрудников. Благодаря инженерам предприятия с 1962 года изготовлены более 80 реакторов ВВЭР для АЭС во всем мире.
|