Энергаз 2026
Главная / Новости / News / Тurboatom has tested and sent to the shipment a runner for Dneprodzerzhinskaya HPP (Ukraine)

Новости


11:39, 15 Сентября 14
Тurboatom has tested and sent to the shipment a runner for Dneprodzerzhinskaya HPP (Ukraine)

Тurboatom has tested and sent to the shipment a runner for Dneprodzerzhinskaya HPP (Ukraine) In September 2014, the specialists of JSC "Turboatom" assembled and carried out functional and oil hydraulic tests of the runner for Dneprodzerzhinskaya HPP No. 6.

During the tests the runner operating capacity of blades turn identity and pressure level were checked, all controlled parameters conform to the standards and are accepted by the customer.

The equipment is sent to the shipment and will be transported to the station, and then the contract will be closed in production.


Все новости за сегодня (4)
12:45, 31 Мая 26

В структуру топливоснабжения Новоленской ТЭС интегрируют газоизмерительный комплекс «ЭНЕРГАЗ»

дальше..
06:03, 31 Мая 26

«Росатом Арктика» подписал трёхлетний договор с ключевым поставщиком Северного завоза Чукотки

дальше..
05:57, 31 Мая 26

Камская ГЭС подарила тактильные книги слабовидящим детям Перми

дальше..
05:49, 31 Мая 26

Атака на Запорожскую АЭС: дрон ВСУ ударил по машинному залу энергоблока №6

дальше..
 

Поздравляем!
Фонд «АТР АЭС» подвел итоги VII Международного проекта «Территория успеха: Пегас» Фонд «АТР АЭС» подвел итоги VII Международного проекта «Территория успеха: Пегас»

Стали известны имена победителей и призеров VII Международного проекта «Территория успеха: Пегас», проводимого фондом «АТР АЭС» совместно с программой «Территория культуры Росатома» при поддержке концерна «Росэнергоатом».



О проекте Размещение рекламы на портале Баннеры и логотипы "Energyland.info"
Яндекс цитирования         Яндекс.Метрика