Eng - News

Balakovo NPP: power unit No.1 has been put out of operation for routine repair


15.06.11 06:40
Power unit No. 1 of Balakovo NPP was shut down for routine repair for 60 days, according to annual preventive maintenance schedule and routine request for service and refueling.

Unloading and shutdown of the power unit were performed without any deviations and in accordance with the regulations for safe operation. The radiation background remained unchanged and there were no violations of limits and conditions of safe operation.
Power units Nos. 2, 3, 4 are operating in the normal mode. The radiation background in Balakovo and in the area of Balakovo NPP location is 0.08 – 0.15 μSv/h, which corresponds to the natural environmental background values typical for European Russia.
 







О проекте Размещение рекламы на портале Баннеры и логотипы "Energyland.info"
Яндекс цитирования         Яндекс.Метрика