![]() |
|
|
|
|
|
Eng - News
"Turboatom" the beginning of the design of equipment for HPP Gotsatlinskoy14.03.11 12:31
Specialists of OJSC "Turboatom" transgressed the design of equipment for HPP Gotsatlinskoy, built on the river Avarsk Coys in Dagestan.
Engineer, started the design work of two Francis turbines of unit capacity of 51 MW with the impeller diameter 3,1 m and two disk hydro valves with diameter of 4 m for Gotsatlinskoy HPP. Preparing to test the model turbines, after which the plant will begin manufacturing the equipment.
Читайте также:
|
|
|
О проекте
Размещение рекламы на портале
Баннеры и логотипы "Energyland.info" |
|