![]() |
|
|
|
|
|
Eng - News
“STROYGAZMONTAZH” has proceeded pipeline.with construction of the Ukhta – Torzhok gas11.03.11 12:12
The 6th string of the Ukhta – Torzhok trunk gas pipeline is being constructed with the purpose of productivity increase of the trunk pipelines system Ukhta – Torzhok during transportation of gas from the Bovanenkovo field. The employer is OJSC “Yamalgazinvest”.
LLC “STROYGAZMONTAZH” will construct 486 km of the gas pipeline with its total length amounting to 972 km. The diameter of pipe is 1420 mm, pressure – 9,8 MPa, designed output – 81,5 bln.m3 of gas annually.
Читайте также:
|
|
|
О проекте
Размещение рекламы на портале
Баннеры и логотипы "Energyland.info" |
|