Энергаз 2026
Eng - News

Transneft Druzhba Finalizes Upgrading the Oil Quantity and Quality Measuring System at Unecha LODS


11.12.15 11:16
Transneft Druzhba Finalizes Upgrading the Oil Quantity and Quality Measuring System at Unecha LODS According to Transneft Druzhba, JSC Technical Upgrading Program for 2015, reconstruction of the oil quantity and quality measuring system (OQQMS) of Unecha line operation dispatcher station (LODS) was finalized.

Three units for measuring oil quality parameters (QMP) and two blade-type voluminous flow transducers were redeveloped. The equipment was commissioned.

All of the assembled equipment of the quality measuring system was manufactured at Velikie Luki Transneftemash plant (a branch of Transneft Upper Volga, JSC).

Unecha LODS is the biggest station in Transneft Druzhba, JSC. From there, oil is pumped in several directions: to Mozyr refinery in Belarus; to Western Europe via Belarus; and via the Second Baltic Pipeline System (BPS-2) to Ust-Luga port.







О проекте Размещение рекламы на портале Баннеры и логотипы "Energyland.info"
Яндекс цитирования         Яндекс.Метрика