![]() |
|
|
|
|
|
Eng - News
RusHydro and Power Machines Completed Large-Scale Renovation of Hydraulic Unit No. 2 at Cheboksarskaya HPP17.09.15 12:37
RusHydro has put into operation renovated hydraulic unit (HU) No. 2 at Cheboksarskaya HPP. Power Machines specialists has recovered rotating blade operation mode of the hydraulic turbine and also manufactured a new stator for the hydraulic generator.
The renovated impeller blades can change their angle depending on the load and pressure head thus increasing the efficiency of the hydraulic unit operation. At present 8 of the 18 hydraulic turbines of the plant are turned to the rotating blade operation mode. Furthermore, the hydraulic turbines of Cheboksarskaya HPP have environmentally friendly design with oil-free impeller hubs. This eliminates even a hypothetical possibility of oil ingress in the water.
Читайте также:
17.09.15 Рубль может добраться до 64
16.09.15 Четыре сценария поведения ФРС
15.09.15 Обзор рынка по итогам понедельника
14.09.15 На пороге решения ФРС США
11.09.15 ФГБУ ЦДУ ТЭК меняет отчетность
|
|
|
О проекте
Размещение рекламы на портале
Баннеры и логотипы "Energyland.info" |
|